We carry out asbestos remediation for contractors, architects, building managers and industry. Large team, multiple crews, scheduling tailored to your site.

Anyone who builds, renovates or demolishes professionally knows that asbestos can turn planning on its head. An unexpected find on site costs time and money. That is why contractors, architects and industrial companies like to work with a fixed partner who can respond quickly. Credim is such a partner. As a certified asbestos removal company with a large team and multiple crews, we plan our interventions around your site, not the other way round.
Asbestos removal is not standard work. Every situation requires its own approach. We master the three legal techniques: the simple handling for bonded material with low risk, the glove bag for pipe insulation in the open air, and the hermetic zone for indoor pipe insulation and for damaged or friable asbestos. We set up these hermetic zones in consultation with your schedule, so the rest of the site can continue as normal. Where necessary, we also arrange airtight packaging and correct transport, right through to processing.

On a construction site, time is money. That is why we align our work with your schedule. Are you in the demolition phase? Then we remove the asbestos before the demolition work begins. Does a roof need to be replaced? Then we plan our remediation so that your roofers can start the next day. We communicate clearly about the demarcation of the zone and the release. This way, everyone knows where they stand.
Before we start, we review the asbestos inventory report and any demolition notification and demolition follow-up plan. If something is not right, we say so in advance. This avoids disputes later on.
Syndics have an extra deadline: for co-ownership, the common areas must have a asbestos certificate for common areas by 31 December 2026 at the latest. This certificate is drawn up by a certified asbestos expert and issued by OVAM. It may indicate asbestos in technical rooms, pipes or common parts. Those who plan now avoid a race against the clock. We help syndics and HOAs with the remediation after the certificate: from an initial site visit to the final inspection.
It is not only the construction sector that has to deal with asbestos. Industrial sites, warehouses and technical installations also often contain asbestos-containing materials. Think of pipe insulation in an old factory hall or asbestos cement sheets on a company roof. For these jobs, we deploy multiple crews and work according to a strict safety plan. We are a certified asbestos removal company and carry out the work in accordance with the applicable regulations.
Good preparation is half the work. That is why we review the asbestos removal procedure and the accessibility of the site together with you in advance. This way, we know exactly which material and which crew we need.
Because we have a large team, we can plan flexibly. A short remediation during a planned shutdown? A larger zone at the weekend to limit disruption? It is all negotiable. Our project leaders help you think through the practical side: access, electricity, water, waste containers. You have time left for your own core tasks.
Request a no-obligation quote for your next project. We would be happy to look at the schedule and the possibilities with you.

Combined demolition with asbestos removal, also on industrial sites.
Bekijk
Eternit corrugated sheets, slates and roof underlayment removed from your roof or outbuilding by a certified team.
Bekijk
White plaster insulation around your central heating pipes, safely removed in a hermetic zone.
Bekijk
Asbestos-containing plaster on walls and ceilings, removed in a hermetic zone.
BekijkWhich technique is needed depends on the material and its condition. Credim masters all three.

For damaged or non-bonded asbestos. The space is sealed airtight and put under negative pressure.
More about this technique
The glovebag method for pipe insulation in the open air, mainly on industrial sites. The material is removed in a sealed bag around the pipe using built-in gloves.
More about this technique
For bonded material with a low risk of fibre release, such as asbestos cement. According to a strict work plan and with the right protection.
More about this techniqueAn expert comes by, assesses the situation and advises on the right technique.
You receive a clear, non-binding quote.
We seal off the zone and remove the asbestos according to legal regulations.
The asbestos is transported and processed airtight.
A certified expert comes by, assesses the situation and gives you a clear, non-binding proposal.